حازم احمد م. (2011) “A proposed algorithm based on linear programming approach for three-stage three jobs flow shop scheduling with criteria : minimize makespan”, IRAQI JOURNAL OF STATISTICAL SCIENCES, 11(2), pp. 612–625. doi: 10.33899/iqjoss.2011.027819.