Yousif Ibrahim, M., and D. Abdulgani Al-kazzaz. “Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality As a Case Study”. Al-Rafidain Engineering Journal (AREJ), vol. 26, no. 1, June 2021, pp. 1-18, doi:10.33899/rengj.2021.128695.1068.