Yousif Ibrahim, M. and Abdulgani Al-kazzaz, D. (2021) “Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study”, Al-Rafidain Engineering Journal (AREJ), 26(1), pp. 1–18. doi: 10.33899/rengj.2021.128695.1068.