YOUSIF IBRAHIM, M.; ABDULGANI AL-KAZZAZ, D. Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study. Al-Rafidain Engineering Journal (AREJ), [S. l.], v. 26, n. 1, p. 1–18, 2021. DOI: 10.33899/rengj.2021.128695.1068. Disponível em: https://ojs.uomosul.edu.iq/index.php/arej/article/view/30596. Acesso em: 6 sep. 2025.