[1]
Yousif Ibrahim, M. and Abdulgani Al-kazzaz, D. 2021. Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study. Al-Rafidain Engineering Journal (AREJ). 26, 1 (Jun. 2021), 1–18. DOI:https://doi.org/10.33899/rengj.2021.128695.1068.